CLEAN AIR FOR MISSION GORGE
  • Basics
    • Contact Us
    • History and Timeline
  • Concerns
    • Blasting
    • Asphalt Odors
    • Blowing Dust
    • Fugitive Airborne Dust
    • Plant Barrier
    • The Noise from Superior
    • Noise Regulations
    • HEALTH RISKS
  • Document Library
  • CUP
    • Copy of the 1990 Conditional Use Permit (CUP)
    • Copy of the 1983 Conditional Use Permit (CUP)
    • Improvement Measures for CUP
    • Purpose of the CUP
    • The CUP Review Process
    • Reviving the CUP Review
    • Non-compliance with Condition 22b
  • Reclamation Plan
  • Lawsuit
    • Improvement Measures
  • Sign Petition
  • Review
  • APCD Permit Summary
  • Rock Plant
  • What Can We Do?
  • Courier Times news article
  • San Diego Reader news article
Clean Air for Mission Gorge
-- ​Addressing concerns about the quarry on Mission Gorge Road --
HOME 
​
REPORT A PROBLEM
​
ABOUT US
HISTORY AND TIMELINE
THE CONDITIONAL USE PERMIT
COPY OF THE CUP
THE CUP REVIEW PROCESS
​
CUP NON-COMPLIANCE 22b
TOO MUCH DUST

​WHAT CAN WE DO?
CONTACT US
THE LAWSUIT
​AREA AFFECTED BY FUMES
SIGN THE PETITION
COURIER TIMES NEWS ARTICLE
​S.D. READER NEWS ARTICLE



WHO WE ARE:
​
Community members concerned about the effects of the Mission Gorge Rock Quarry.

Our Vision:

We envision all community members in the Mission Gorge area benefiting from a safe and healthful environment, free from industrial pollutants, excessive noise, obnoxious odors, and harmful impacts of blasting.
 
Our Stance:
• No business is too big to be above the law.
• The community has the right:
     • to be safe.
     • to fully use and enjoy their property.
​     • to be informed about all regulations that govern the quarry and its operation. 
     • to know who to contact when there are problems.
​
Problems that officials don't know about will never get fixed.
HOW TO REPORT A PROBLEM:

​Facility name: Mission Gorge Mine / Canyon Rock; Also known as Superior Ready Mix
Address: 
​7500 Mission Gorge Road, San Diego, CA 92120
Owner: Vulcan Materials Company


ODORS and DIRTY OR UNUSUAL EMISSIONS COMING FROM THE PLANT:
Contact the Air Pollution Control District (APCD)  Call 858-586-2650 or email [email protected]
Ask for the inspector follow-up with you.
OK to use the "Get It Done" app.
(CLEAN, white "smoke" that quickly rises and dissipates is most likely only steam and does not
need to be reported.  If it is dirty looking, report it.)


SEDIMENT TRACKED OUT INTO MISSION GORGE ROAD
Contact the City's Stormwater Code Enforcement
[email protected]   or   619-235-1000 

Ask for the inspector to follow-up with you.
You may have better luck contacting the
Regional Water Board.


NOISE, SAFETY of OPERATIONS, HOURS of OPERATIONS, DAMAGES FROM BLASTING:
Contact the City: Leslie Sennett at San Diego Code Enforcement
[email protected]
Ask for someone to follow-up with you.
Do NOT use the "Get It Done" app.

HEALTH EFFECTS and TOXIC AIR QUALITY CONCERNS
Contact the Air Pollution Control District (APCD)
www.sdapcd.org   or   Phone: (858)586-2600
Do not use the "Get It Done" app.
​

TO BE PUT ON AN EMAIL LIST FOR THE BLASTING SCHEDULE:
Contact Barbara Goodrich-Welk, Manager, Community & Government Relations for Vulcan Materials at: [email protected]
You will receive an email from Jesse Sharp ([email protected]) a few days before each scheduled blast.
[Do NOT call here to report a blasting problem.  Call the City, above]

Report problems as many times as necessary.​
​Do not use the "Get it Done" app to report these problems, except as indicated.  These issues are beyond the scope of the "Get it Done" app.                          
.
Picture
The dust starts here.

     
Picture
• Home   • About    • Contact

  • Basics
    • Contact Us
    • History and Timeline
  • Concerns
    • Blasting
    • Asphalt Odors
    • Blowing Dust
    • Fugitive Airborne Dust
    • Plant Barrier
    • The Noise from Superior
    • Noise Regulations
    • HEALTH RISKS
  • Document Library
  • CUP
    • Copy of the 1990 Conditional Use Permit (CUP)
    • Copy of the 1983 Conditional Use Permit (CUP)
    • Improvement Measures for CUP
    • Purpose of the CUP
    • The CUP Review Process
    • Reviving the CUP Review
    • Non-compliance with Condition 22b
  • Reclamation Plan
  • Lawsuit
    • Improvement Measures
  • Sign Petition
  • Review
  • APCD Permit Summary
  • Rock Plant
  • What Can We Do?
  • Courier Times news article
  • San Diego Reader news article